Indirect Standard Time Measurement Using Most Method on Sub Assy Working Model B5581 at Pt. XYZ

Meylia Vivi Putri

Abstract


PT XYZ applies a target time for completion of a harness. The problem that will be discussed in this research is how to calculate the standard time and improve the system/work method in order to increase the amount of production of the B5581 sub assy model using the MOST (Maynard Operation Sequence Technique) method. MOST itself is a work measurement technique that is arranged based on a sequence of sub-activity or movement. These sub-activities are basically obtained from movements that have repetitive patterns such as reaching, holding, moving and positioning objects and these patterns are identified and arranged as a sequence of events followed by object movement. Based on the research results, the standard time obtained from data processing for the initial working method is 3.12 minutes/harness and the standard output is 149 harness/day. The standard time can still be reduced again by improving the actual work method, because in the actual work method there are still many transportation activities so that it can waste the operator's work time. After the transportation activities are eliminated, the standard time of the proposed work method is 1.5125 minutes/harness and the standard output is 317 harnesses/day.

 

Keywords: Normal time, MOST, Standard time, Working Method


DOI: http://dx.doi.org/10.23960/jpvti.v3.i1.202109


Full Text:

PDF

References


Aziria, S. (2017). Penentuan Waktu Baku Untuk Menentukan Produktifitas Karyawan Di Perusahaan Tas CV.A’Tilyo Andalas Prima. STTIND Padang.

Febriana, N. V., Lestari R., E., & Anggraini, S. (2015). Analisis Pengukuran Waktu Kerja dengan Metode Pengukuran Kerja Secara Tidak Langsung pada Bagian Pengemasan di PT Japfa Comfeed Indonesia Tbk. Industri, Volume 4, 66–73.

Hanash, E. A., Karim, A. N., Tuan, S. T., & Mohiuddin, A. K. (2017). Throughput Enchancement of Car Exhaust Fabrication Line by Applying MOST. International Conference on Mechanical, Automative and Aerospace Engineering.

Karim, A. N., Kays, H. E., Amin, A. K., & Hasan, M. H. (2014). Improvement of Workflow and Productivity through Application of Maynard Operation Sequence Technique (MOST). International Conference on Industrial Engineering and Operations Management, 2163–2170.

Lesmono, I. (2013). Aplikasi Metode Most ( Maynard Operation Sequence Technique ) Untuk Menentukan Waktu Baku Kerja Dalam Upaya Meningkatkan Jumlah Produksi.

Mishra, A., Agnihotri, V., & Mahindru, D. V. (2014). Application of Maynard Operation Sequence Technique (M.O.S.T) at Tata Motors and Adithya Automotive Application Pvt Ltd. Lucknow for Enhancement of Productivity-A Case Study. Global Journal of Researches in Engineering: Automotive Engineering., 14(2).

Mital, A., Desai, A., & Mital, A. (2016). Fundamentals of Work Measurement: What Every Engineer Should Know (1st ed.). London : CRC Press. https://www.perlego.com/book/2029308/fundamentals-of-work-measurement-what-every-engineer-should-know-pdf

Montororing, Y. D. R. (2018). Usulan Penentuan Waktu Baku Proses Racking Produk Amplimesh Dengan Metode Jam Henti Pada Departemen Power Coating. Jurnal Teknik, 7, 53–63.

Niebel, Benjamin, & Freivalds, A. (2009). Methods, Standards, and Work Design. New York : McGraw-Hill Companies, Inc.

Rachman, T. (2013). Penggunaan Metode Work Sampling PENGGUNAAN METODE WORK SAMPLING UNTUK MENGHITUNG WAKTU BAKU DAN KAPASITAS PRODUK ... Jurnal Inovisi, 9.

Santoso, S. (2010). Mastering SPSS 18. PT Elex Media Komputindo.

Setiawan, D. A. (2008). Analisa Produktivitas Dengan The American Productivity Center Methods ( Studi Kasus Pada Perusahaan Batik “ Pesisir ” Pekalongan ). Universitas Muhammadiyah Surakarta.




DOI: http://dx.doi.org/10.23960%2F24894

Refbacks

  • There are currently no refbacks.


Jurnal Pendidikan Teknologi Informasi dan Vokasional

Diterbitkan oleh:

PROGRAM STUDI PENDIDIKAN TEKNOLOGI INFORMASI
FAKULTAS KEGURUAN DAN ILMU PENDIDIKAN
UNIVERSITAS LAMPUNG

 

Jl. Prof. Dr. Sumantri Brojonegoro No.1Kota Bandar Lampung
Homepage: http://pti.fkip.unila.ac.id
email: pti@fkip.unila.ac.id